23 Jun

Engine fitting

I’m happy to say I finally have the Ecotec LNF engine and Chevy T5 transmission fitted into the GT6! This was a substantial amount of work, and even now it’s
Josh
no comments
23 Jun

Blasting & Body

While I’ve been slowly getting the engine and transmission nestled into their new home in the frame, I sent off the body to be glass blasted and have it epoxy
Josh
no comments
14 Jun

Frame boxing

As I’m fitting the new engine / transmission, I’ve had to make a lot of modifications to the frame to fit everything in. The bellhousing and transmission are a lot
Josh
no comments
12 Jun

Frame cleaned and rear fitted

After getting most of the frame stripped down of components, I took it outside and pressure washed & degreased it. Took off a lot of grime from 50 years on
Josh
no comments
05 Jun

Down to the frame

I made good progress the last few days on stripping the mechanical portions of the car. I got the rear completely disassembled and ready to go to Gary at Edge
Josh
no comments
03 Jun

Christmas at the GT6 household

New drivetrain parts are here! Over the past week I’ve got in the Chevy T5 transmission with 2.95 first gear, the Subaru R160 LSD w/4.11 gear, and my Ecotec LNF
Josh
no comments
01 Jun

First floor section repaired

As you can see from this picture, my poor GT6 has a floor made of swiss cheese and body filler. It’s more than a little depressing, and the one of
Josh
no comments